Summary
The EPA's Final Coal Combustion Residual (CCR) Rule was published on April 17, 2015 and went into effect on October 19, 2015. The rule regulates existing active CCR waste landfills and surface impoundments (ponds) and all new CCR waste disposal units built after the rule's publication. Tampa Electric's Big Bend Station has fulfilled all of its compliance obligations under the rule by closing and retrofitting all regulated CCR Units at the facility and has posted all relevant records related to these closure projects on this website.
TECO Big Bend CCR Rule Compliance Data and Information
- Economizer Ash Closure by Removal - 2021 Asbuilts - (Posted 06/20/23)
- Economizer Ash System - Closure Completion
- TECO Big Bend CCR Annual Report 2020
- TECO Big Bend Coalfield Pond Closure Certification 2021
- TECO Big Bend Eapp Annual Report 2019
- Economizer Ash CCR Closure Temp Ditch Crossing Hydrology Report
- Economizer Ash CCR Closure Temp Ditch Crossing Plans
- Ash Ponds Detection Monitoring Report (Baseline)
- Ash Ponds Detection Monitoring Report 4
- Ash Ponds Detection Monitoring Report 3
- Ash Ponds Closure Specifications
- Ash Ponds Closure Plan Drawings
- Ash Ponds System CCR Impoundment Inspection Report - 2018
- Ash Ponds System CCR Impoundment Inspection Report - 2017
- Ash Ponds Annual GW Report - 2018
- Ash Ponds Detection Monitoring Report 2
- Slag Pond Closure Plan
- Ash Ponds Ash Closure Plan
- Ash Ponds Alternate Source Demonstration (ASD)
- Ash Ponds Certification of Alternate Source Demonstration
- Ash Ponds Annual GW Report
- GW Monitoring System Design and Construction Report - 2017
- CCR Statistical Analysis Plan - 2017
- Structural Stability Report CCR Economizer Ash System - 2017
- Annual Berm Inspection Report - 2016
- Ash and Slag Ponds Preliminary Closure Plan
- CCR Groundwater Monitoring Plan & Statistical Method Certification
- Ash Ponds System CCR Impoundment Inspection Report - 2015
- CCR Fugitive Dust Control Plan